DATE
MAINTENANCE
10 Dec 2006
cold head stopped? Lenze problem?
03 Mar 2008
removed from C14 at Cedar Flat
13 Mar 2008
opened refrig, cleaned cylinder and displacers; changed stage3 seal, worn through in 1 spot; reused seals for stage 1 and 2
31 Mar 2008
removed 3mm mixer xx, installed HIA-185
; removed 1mm mixer 31-015-2, found its SIS device had fallen to bottom of slot;
rebuilt with mixer 31-015-1, WBA13 amp with bias tee annex to shorten distance from mixer to amp
replaced 200 ohm heater resistors on stage3 with 600 ohm resistors
in lab tests running at 47/11/3.5/3.7/3.7 K
09 Apr 2008
installed on C15 at Cedar Flat
cooled to 45/12/3.7/3.8/3.9 K
10 Sep 2009
removed from C15 at Cedar Flat
17 Sep 2009
cleaned displacers and cylinder